nav
Call for help on
0800 LOSTPOWER
or 0800 567 876
Home > Prices

>>Prices from 1 April 2004 to 31 March 2005
Prices from 1 April 2005 to 31 March 2006
Prices from 1 April 2006 to 31 March 2007
Prices from 1 April 2007 to 31 March 2008
Prices from 1 April 2008 to 31 March 2009
Prices from 1 April 2009 to 31 March 2010

Minister of Energy's Notice of Exemption (Low Fixed Charge Tariff Option)

Click here to download [PDF 152Kb].

Electra owns and operates the electricity lines and distribution assets in the Kapiti-Horowhenua region.

Electra invoices these charges to Electricity Retailers, who then include these in your regular electricity bill.
 
To download a printable copy of this information in PDF format click here. To download the free PDF reader software from Adobe, click on the Adobe Acrobat Reader Logo.

Electra Charges from 1 April 2010 (excluding GST)
 


 Users
(EST)


Price
Code
Price
Option

Price Option
Component

Time
Zone On
Line Function
cents/unit
Transmission cents/unit

Total
cents/unit

electra electricity electricity electricity electricity electricityelectricity electricity electricity

36694

A 

Anytime

All

7.22 1.51 8.73

24111

M Managed Saver As required 2.02 0.80 2.82
3295
 
C Combined
(Closed)
As required 5.49 1.24 6.73
646
 
N Super Thrifty 2300-0700 0.65 0.15 0.80
2124 B Thrifty 2300-0700 0.82 0.15 0.97
1300-1600
 
0.82 0.15 0.97
596 TS Triple Saver

Night

2300-0700 0.65 0.15
0.80
TS

Peak

0700-1100 7.87 1.54 9.41
1700-2100 7.87 1.54 9.41
TS

Off peak

1100-1700 1.13 0.80 1.93
2100-2300
 
1.13 0.80 1.93
506 A PayGo   All 7.22 1.51 8.73

All PayGo sites incur a standard Supply Charge F


 
U Street Lighting Timetable 5.02 1.52 6.54

 
U Community Lighting Timetable 6.11 1.52 7.63
1582 DN Night/Day

Night

2100-0700 0.79 0.15 0.94
DN

Day
 

0700-2100 7.66 1.54 9.20
42030 F Supply Charge

cents/day

5.00 10.00 15.00

 

Back to top ^



Power Factor Charge

This applies to commercial customers. Where the power factor is less than 0.95 Electra reserves the right to impose a power factor charge.  The charge will be based on a multiplier of 2% of the monthly total Line charges for every 0.01 power factor below 0.95 lagging.


 
Closed Option

The Combined Option is no longer available except to existing users.


Network Losses

Network Losses Loss Factor Code Loss Factor
Network Losses 6.60% 1 1.071


Back to top ^

123

Copyright © 2005 - 2010 Electra. All rights reserved.
Powered by the Xsite Content Management System.